Printable Bathroom Renovation Checklist
Prepared by: [YOUR NAME]
Date: [DATE]
Planning and Preparation
Task | Completed (✓) |
|---|
Define the renovation goals and budget. | |
Measure the bathroom dimensions and layout. | |
Create a design plan or consult a professional designer. | |
Obtain necessary permits if required. | |
Research and hire contractors if needed. | |
Demolition
Task | Completed (✓) |
|---|
Remove old fixtures (sink, toilet, tub, etc.). | |
Take out existing tiles, flooring, and drywall as necessary. | |
Disconnect plumbing and electrical components. | |
Properly dispose of debris and old materials. | |
Plumbing and Electrical
Task | Completed (✓) |
|---|
Install or update plumbing for new fixtures. | |
Rewire electrical outlets, switches, and lighting. | |
Add GFCI (Ground Fault Circuit Interrupter) outlets. | |
Install an exhaust fan or ventilation system. | |
Structural Changes
Task | Completed (✓) |
|---|
Frame any new walls or partitions. | |
Repair or replace the subfloor if damaged. | |
Ensure walls and floors are level and smooth. | |
Installation
Task | Completed (✓) |
|---|
Install bathtub or shower unit. | |
Place vanity, sink, and countertop. | |
Set up toilet. | |
Install cabinets and storage units. | |
Add mirrors and decorative elements. | |
Tiling and Flooring
Task | Completed (✓) |
|---|
Lay down the waterproof underlayment. | |
Install floor tiles or other chosen flooring. | |
Tile shower walls, backsplashes, and other surfaces. | |
Grout and seal all tile work. | |
Painting and Finishing
Task | Completed (✓) |
|---|
Paint or wallpaper walls as per the design plan. | |
Touch-up trim, moldings, and other details. | |
Apply caulking around fixtures and seams. | |
Lighting and Accessories
Task | Completed (✓) |
|---|
Install lighting fixtures (ceiling, vanity, etc.). | |
Add towel bars, hooks, and holders. | |
Place bath mats, rugs, and other decor. | |
Final Checks
Task | Completed (✓) |
|---|
Test all plumbing and electrical systems. | |
Ensure fixtures are securely installed. | |
Clean up all construction dust and debris. | |
Conduct a final walk-through to check for missed details. | |