Interior Design Project Planner Template with a floral cover, timeline and status tables and a lined notes page

Interior Design Project Planner Template is an elegant project planner for organizing interior design projects, professionally designed by Template.net, with a floral cover, timeline and status tables and a lined notes page in golden brown, warm taupe and soft grey.

Customize it in two ways:

  • Editable with AI Replace the planner content with [text_input], replace the logo in [logo_image] with [Upload image], and change the relevant elements on each page to match, while keeping each page's similar style, composition, and background.
  • Easily edit it manually: customize the content, elements, photos, colors and fonts.

Free Interior Design Project Planner Template

By Template.net

Open Editor
Planner Generator