Work at Height Risk Assessment

Work at Height Risk Assessment

1. Project and Location Details

Project Name/Description:

[Project Name - e.g., "Wind Turbine Maintenance"]

Location:

[Specific Location Address]

2. Task Analysis

Nature of Work:

Comprehensive maintenance of wind turbines, involving climbing, working on turbine platforms, and handling heavy equipment.

Duration and Frequency:

The project is estimated to last 8 weeks, with daily work schedules from [Start Time] to [End Time].

3. Risk Identification

Potential Hazards:

Identified hazards include falls from significant heights, hazards from rotating equipment, electrical risks, and adverse weather conditions impacting balance and equipment stability.

Cause and Effect:

Potential causes range from equipment malfunction, and loss of footing due to slick or unstable surfaces, to sudden weather changes.

4. Risk Evaluation

Likelihood of Occurrence:

The probability of electrical hazards and equipment malfunction is rated as medium, while fall and weather-related risks are high, especially during adverse weather conditions.

Severity of Impact:

The consequences of falls and electrical hazards could be critical, potentially leading to severe injury or fatality.

5. Control Measures

Preventive Measures:

Implementation of comprehensive safety protocols including mandatory use of fall arrest systems, routine equipment inspections, weather monitoring for high winds or lightning, and structured work processes to minimize exposure to hazards.

Protective Equipment:

Requirement for specialized PPE such as shock-absorbing fall arrest harnesses, insulated gloves for electrical work, anti-slip footwear, and helmets with visors.

6. Emergency Procedures

Rescue Plan:

An emergency rescue plan tailored for high-altitude rescues, including specialized rescue teams and equipment.

First Aid and Medical Facilities:

On-site first aid kits and trained personnel for immediate response. Arrangements with [Nearest Hospital Name at Your Client Address] for emergency medical services.

7. Review and Monitoring

Supervision Plan:

Continuous oversight by experienced personnel specialized in high-altitude work, ensuring adherence to safety protocols.

Review Schedule:

Regular review of the risk assessment at least every month or after any significant changes in work conditions, procedures, or equipment.

Risk Assessment Conducted by:

[Your Name]

[Your Job Title]

[Your Company Name]

Date of Assessment: [Month Day, Year]

Health and Safety Templates @ Template.net