Industrial Panel Schedule
General Information
Circuit Listings
Circuit No. | Description | Load (Amps) | Breaker Size (Amps) | Notes |
---|
1 | Main Motor 1 | 20 | 30 | Production line 1 |
2 | General Lighting | 10 | 15 | Office and corridor |
3 | Main Motor 2 | 15 | 20 | Production line 2 |
4 | HVAC Unit | 25 | 40 | Cooling system |
5 | Emergency Lighting | 5 | 10 | Backup power supply |
6 | Pump 1 | 30 | 40 | Water supply |
7 | Control Panel | 8 | 15 | Main controls |
8 | HVAC Control System | 12 | 20 | Temperature control |
9 | Power Outlet Circuit | 10 | 15 | Workshop outlets |
10 | Air Compressor | 20 | 30 | Compressed air supply |
Summary of Load Calculations
Total Load (Amps): 150 Amps
Total Breaker Capacity (Amps): 265 Amps
Remaining Capacity: 115 Amps
Safety and Compliance Information
Grounding Method: Separate grounding system with ground rods
Compliance Standards: NEC (National Electrical Code), NEMA (National Electrical Manufacturers Association)
Inspection Date: August 10, 2054
Next Inspection Due: February 10, 2055
Additional Notes
Ensure all circuits are labeled clearly at the panel.
Regular maintenance checks should be scheduled quarterly.
Refer to the schematic diagram for wiring details located in the electrical room.