Yacht Panel Schedule
Vessel Name: Ocean Explorer
Date: June 5, 2051
Prepared by: [Your Name]
Email: [Your Email]
Electrical Panel Overview
Panel Name | Location | Voltage | Load Type | Description |
|---|
Main Panel | Engine Room | 230V | AC | Main distribution panel. |
Salon Panel | Salon | 230V | AC | Powers salon lights and outlets. |
Galley Panel | Galley | 230V | AC | Supplies galley appliances. |
Cabin 1 Panel | Cabin 1 | 230V | AC | Lighting and outlets in Cabin 1. |
Cabin 2 Panel | Cabin 2 | 230V | AC | Lighting and outlets in Cabin 2. |
Battery Charger | Engine Room | 12V | DC | Charges DC battery system. |
Inverter Panel | Engine Room | 230V | AC | Converts DC to AC for outlets. |
Emergency Panel | Bridge | 230V | AC | Emergency lighting systems. |
Circuit Details
Circuit No. | Load Description | Cable Size | Fuse Rating | Status |
|---|
1 | Main engine starter | 10 mm² | 100A | Active |
2 | Salon lights | 1.5 mm² | 10A | Active |
3 | Refrigerator | 2.5 mm² | 16A | Active |
4 | Cabin 1 lights | 1.5 mm² | 10A | Active |
5 | Cabin 2 lights | 1.5 mm² | 10A | Active |
6 | Battery charger | 6 mm² | N/A | Active |
7 | General power outlets | 10 mm² | 30A | Active |
8 | Emergency lighting | 2.5 mm² | 10A | Standby |
Notes
Safety Precautions: Ensure all electrical work is conducted following maritime safety regulations.
Maintenance Schedule: Regular checks of panels and circuit integrity are recommended every six months.
Modifications: Any modifications to this schedule should be documented and reported to the electrical engineer.
Schedule Templates @ Template.net