Solar Power Design Panel Schedule
Project Information
Project Name: Sunnyvale Solar Installation
Location: 123 Solar Lane, Sunnyvale, CA
Date: September 25, 2054
Prepared By: [Your Name]
Contact Information: [Your Email]
System Overview
Panel Specifications
Panel Model | Manufacturer | Quantity | Rated Power (W) | Mounting Type |
|---|
SunPower SPR-320 | SunPower Corp. | 75 | 320 | Fixed Rack |
LG NeON R 350 | LG Electronics | 30 | 350 | Fixed Rack |
Canadian Solar CS3K-325 | Canadian Solar Inc. | 45 | 325 | Fixed Rack |
Electrical Specifications
Parameter | Value |
|---|
Total DC Output Power | 50 kW |
Total AC Output Power | 45 kW |
System Voltage | 480 V |
Inverter Efficiency | 98% |
Expected Annual Energy Production | 80,000 kWh/year |
Wiring and Connections
Cable Type | Size (AWG) | Length (m) | Quantity | Notes |
|---|
Solar PV Wire | 10 | 100 | 10 | UV resistant |
DC Conductor | 6 | 50 | 5 | For inverter connections |
AC Conductor | 4 | 30 | 3 | For grid connection |
Safety and Compliance
Standards Compliance: UL 61730, IEC 61215
Safety Features: Surge protection devices, grounding system, and circuit breakers included.
Notes
Site Considerations: Installation on a flat roof with minimal shading from nearby trees. Regular maintenance checks are recommended for optimal performance.
Installation Timeline: Expected installation duration is 4 weeks, starting from October 15, 2054.