Free Inspectorate Team Punch List

Prepared by: [Your Name]
Project Name: Tranquil Haven Renovation
Date: July 5, 2054
Introduction:
This Punch List ensures all contracted work for the Tranquil Haven Renovation meets agreed-upon quality standards. Each item listed must be promptly addressed by responsible parties to achieve project completion and client satisfaction.
Painting
Item Description | Location | Responsible Party | Status | Priority |
|---|---|---|---|---|
Touch-up paint needed in living room; patch visible cracks. | Living Room | Ace Painting Inc. | Open | High |
Paint exterior trim around windows and doors. | Exterior | Ace Painting Inc. | Pending | Medium |
Electrical
Item Description | Location | Responsible Party | Status | Priority |
|---|---|---|---|---|
Realign and secure ceiling light fixture in master bedroom. | Master Bedroom | Spark Electric Co. | Pending | Medium |
Install dimmer switches in dining room and kitchen. | Dining Room, Kitchen | Spark Electric Co. | Open | High |
Carpentry
Item Description | Location | Responsible Party | Status | Priority |
|---|---|---|---|---|
Adjust kitchen cabinet doors for proper alignment and functionality. | Kitchen | Prime Cabinets LLC | Open | High |
Install shelving in garage according to homeowner's specifications. | Garage | Crafty Carpentry | Closed | Low |
Plumbing
Item Description | Location | Responsible Party | Status | Priority |
|---|---|---|---|---|
Repair leak under kitchen sink. | Kitchen | Aqua Plumbing Inc. | Open | Medium |
Replace showerheads in master bathroom with new water-efficient model. | Master Bathroom | Aqua Plumbing Inc. | Closed | Low |
Flooring
Item Description | Location | Responsible Party | Status | Priority |
|---|---|---|---|---|
Sand and refinish hardwood floors in hallway and bedrooms. | Hallway, Bedrooms | Floor Masters Inc. | Open | High |
General
Item Description | Location | Responsible Party | Status | Priority |
|---|---|---|---|---|
Regrout bathroom tiles near shower; ensure waterproofing integrity. | Bathroom | Tile Masters Inc. | Open | High |
Final sanding and varnishing needed for front door; ensure smooth finish. | Entryway | Crafty Carpentry | Closed | Low |
Additional Notes:
All work must meet specified quality standards and aesthetic requirements.
Coordinate with project manager for final homeowner walkthrough and approval.
Deadline for completion: July 10, 2054.
Signatures:

Quality Control Inspector
Project Manager
Homeowner Approval
- 100% Customizable, free editor
- Access 1 Million+ Templates, photo’s & graphics
- Download or share as a template
- Click and replace photos, graphics, text, backgrounds
- Resize, crop, AI write & more
- Access advanced editor
Enhance inspection efficiency with the Inspectorate Team Punch List Template from Template.net. This customizable, downloadable, and printable template helps you track and complete inspection tasks effectively. Editable in our AI Editor Tool, tailor every detail to fit your specific needs, ensuring a comprehensive and well-structured punch list for thorough and accurate inspections.