Building Checklist
Prepared by: [Your Name]
Company: [Your Company Name]
Date: [Insert Date]
1. Pre-Construction Planning
Checklist Item | Completed | Comments |
---|
Obtain necessary permits and approvals | | |
Site survey and soil testing were conducted. | | |
Environmental impact assessment completed. | | |
The project budget and timeline are established. | | |
The construction team selected and contracts signed | | |
2. Foundation and Structural Work
Checklist Item | Completed | Comments |
---|
The site was cleared and leveled | | |
Excavation completed | | |
Footings were poured and the foundation was installed. | | |
Structural framework erected | | |
Inspections of foundation and structural integrity | | |
3. Building Systems Installation
Checklist Item | Completed | Comments |
---|
The plumbing system was installed and inspected | | |
Electrical wiring was completed and inspected. | | |
HVAC (heating, ventilation, and air conditioning) system installed | | |
Fire safety systems (sprinklers, alarms) installed and tested | | |
Insulation and soundproofing materials installed | | |
4. Interior and Exterior Finishing
Checklist Item | Completed | Comments |
---|
Roofing materials installed | | |
Windows and doors fitted | | |
Interior walls, flooring, and ceilings are finished. | | |
Exterior siding, paint, and landscaping completed. | | |
Final inspection of all building finishes | | |
5. Final Steps and Handover
Checklist Item | Completed | Comments |
---|
Building codes compliance check and certifications obtained | | |
Final walk-through with the construction team | | |
Issue of occupancy permit | | |
Handover to owner or property management | | |
Maintenance schedule and contact information provided | | |
Checklist Templates @ Template.net