Software Unit Test Plan Layout
1. Introduction
1.1 Purpose
Briefly describe the purpose of the unit test plan.
1.2 Scope
Define the scope of the testing (e.g., modules, classes, or functions to be tested).
1.3 References
List relevant documents, such as design specifications, coding standards, or testing guidelines.
2. Test Plan Overview
2.1 Objectives
Outline the objectives of the unit testing.
2.2 Testing Approach
Explain the testing methodologies (e.g., black-box, white-box, or gray-box testing).
2.3 Tools and Environment
Specify the tools, frameworks, programming languages, and environments to be used for testing.
3. Unit Description
3.1 Unit Name/Identifier
Provide unique identifiers and a brief description of each unit under test.
3.2 Functional Description
Describe the intended functionality of the unit.
3.3 Dependencies and Assumptions
List dependencies and assumptions that impact the unit's behavior.
4. Test Design
4.1 Test Cases
Include the following details for each test case:
Test Case ID
Description
Input Data
Expected Result
Actual Result
Status (Pass/Fail)
4.2 Test Data
Define the test data, including valid, invalid, and edge-case inputs.
4.3 Test Coverage
Map test cases to specific requirements or functionality to ensure coverage.
5. Test Environment
5.1 Hardware Requirements
List hardware specifications required for testing.
5.2 Software Requirements
Specify software configurations, libraries, or dependencies.
5.3 Setup and Configuration
Describe the steps to set up and configure the testing environment.
6. Test Execution
6.1 Test Execution Procedure
Step-by-step instructions for executing tests.
6.2 Test Schedule
Provide a timeline for test execution.
6.3 Responsibility Assignment
Assign responsibilities to team members for executing test cases.
7. Results and Reporting
7.1 Test Results
Provide a summary of test results (e.g., tables, graphs, or reports).
7.2 Issue Tracking
Document any defects or issues discovered during testing.
7.3 Metrics
Include metrics such as pass rate, defect density, or execution time.
8. Risks and Mitigation
9. Review and Approval
9.1 Review Checklist
List items to be reviewed before approval (e.g., test case completeness, coverage).
9.2 Sign-Off
Include fields for signatures and dates from stakeholders.
Plan Templates @ Template.net